Skip to content

Union Pier Road Construction – Closure

Please use Lakeshore Road as an alternate route during this closure

This project is improving safety along this section of the Red Arrow Highway corridor for both vehicular and pedestrian traffic. With many popular restaurants, cafes, and shops along the corridor, the project will provide a safe, walkable space to access and enjoy the vibrant local community. The corridor has been reimagined to include sidewalk, a non-motorized path, and various other streetscape elements at the intersection of Red Arrow Highway and Union Pier Road. In addition, Red Arrow Highway from Community Hall Road to Berrien Street will be converted from a four lane to a three lane section with a dedicated center left turn lane.

 

Wightman - LINK

Red Arrow Highway - Union Pier Corridor Project Updates

Berrien County Road Commission - LINK

Paving and Construction Updates

Red Arrow Highway and the Townline/Union Pier Road intersection will be completely closed to traffic. Local traffic will still be able to access drives, but no thru traffic will be permitted. Please use the posted detour route.

GRSD Sewer Authority - LINK

Union Pier Sewer Relief Project

The GRSD Sewer Authority will be installing a new sanitary sewer along Red Arrow Highway between Union Pier Road and Berrien Street. The Sewer Authority will also be replacing existing sanitary sewer in Townline Avenue between Greenwood Avenue and Red Arrow Highway.

Union Pier Community Alliance   LINK

The Union Pier Community Alliance is a group for Union Pier residents and businesses to share information about goings on in the neighborhood. It was created specifically in order to keep everyone in the loop about the Red Arrow Road Development and the Downtown Union Pier Beautification process.

Scroll To Top